ЁЯЪА How I Cut Metalliser Boat Change Time from 65 to 35 Minutes тАФ A 2017 Case Study
ЁЯУЦ 18-min read | Real Plant Case Study | Published April 2026 | Bookmark for reference
In July 2017, our metalliser boat change took 65 minutes on average. Eight weeks later, we did it in 35. No new machine. No capex. No consultants on the floor. Just video, ECRS analysis, tool boxes, check lists, and a team that decided 65 minutes was no longer acceptable.
This blog tells you exactly how it happened тАФ week by week, activity by activity, mistake by mistake. I led documentation as the metallizer engineer on the project. I filmed every changeover, timed every activity in seconds, and sat through every meeting where we tore the process apart. The data and progression in this blog are real, taken from the original 2017 project records.
If you run a metalliser plant in India today and your boat change still takes 60+ minutes, this is the playbook. The technical environment has not changed much since 2017 тАФ the same boats, same vacuum systems, same operator pressures. What we did then will still work in your plant tomorrow.
I am writing this in April 2026, nine years after the original MET-1 project. In the years since, I have seen similar SMED methodology applied at multiple plants across India, and the results consistently land in the 30-50 percent reduction range. The 2017 data presented in this blog is real plant history. The frameworks translate directly to any metalliser plant operating in 2026.
- Starting point: 65 min average (June-July 2017 baseline)
- Step 1 result: 38 min average (8 weeks, ECRS + tool boxes + check lists)
- Step 2 result: 35 min average (4 more weeks, video re-analysis)
- Total project time: 12 weeks, zero capex
- Method: ECRS (Eliminate, Combine, Rearrange, Simplify) + 3 operators + 4-zone offline prep
ЁЯУН The Problem in July 2017
Our team got a clear directive that month: reduce boat change time at MET-1. The question was not whether we could do it тАФ it was whether we could do it without buying anything new.
The numbers stared at us:
- Average boat change time over the previous 3 months: 65 minutes
- Boat changes per day: roughly 1.3 events per machine
- Daily downtime from boat changes alone: ~85 minutes per machine
- Each minute saved per cycle: 1.3 minutes saved per day, ~40 minutes per month
If we could cut 25 minutes per cycle, we would recover roughly 13 hours per month per machine тАФ enough for 3 to 4 extra production jumbos. Across our 2-machine plant, that meant 6-8 extra jumbos every month with zero capex.
Our team was 10 people: a mentor, a team leader, me as documentation lead (the metallizer engineer), and 7 operators across shifts. We met every Monday and Thursday at 4 PM. Our brief was simple: bring the average down to 50 minutes in 3 months.
ЁЯУ╣ Week 1 тАФ The Day We Filmed Ourselves
The first thing I did was set up a video camera and record an actual boat change from start to finish. I expected to find a few obvious problems. What I actually found was uncomfortable.
Watching the video back with a stopwatch, I logged 31 activities for Operator 1 alone тАФ and another 22 for Operator 2 in source-section work, plus 23 for Operator 3 on the loading and unloading side. Together, the three operators had 76 distinct activities during one boat change. Most of them looked productive. Some were not.
Here are five things the video showed us that we did not want to admit:
- Tool taking тАФ 23 seconds. Operator 1 walked to the tool stand, picked up tools, walked back. Every cycle. Every time.
- Boat section cleaning by scrapper repeated 3 times. Lines 10, 12, 14 of the activity log each took 55, 72, 300 seconds. Why three rounds? Because the scrapper was being shared, dropped, picked up, used by another operator, picked up again.
- Chamber closed, then opened again, then closed again. Lines 28-31 of Operator 1's log: chamber closing (46s), chamber opening (37s), shield setting and checking (148s), chamber closing (50s) тАФ 281 seconds wasted because someone forgot to do the shield setting before the first close.
- Operator 3's drum cleaning тАФ 4 minutes 35 seconds. Necessary work, but not properly choreographed with Operator 1's source work. The two zones interfered with each other.
- "Got tape" тАФ 1 minute 30 seconds. Operator 3 walked across the floor, got a roll of masking tape, walked back. Every cycle.
This was the moment I realised the 65 minutes was not a problem with our equipment. It was a problem with how we organised our work. The same operators, doing the same physical tasks, would have finished in 40 minutes if the choreography had been right.
ЁЯЫая╕П The ECRS Discipline тАФ Eliminate, Combine, Rearrange, Simplify
Our team leader introduced us to ECRS тАФ a Toyota-origin technique for activity analysis. For every single activity in our 76-row activity log, we asked four questions in order:
- E тАФ Eliminate: Can this activity be removed entirely without harming the outcome?
- C тАФ Combine: Can this activity be merged with another, removing the transition between them?
- R тАФ Rearrange: Can this activity be moved to a different point in the sequence (especially: can it happen before the chamber opens)?
- S тАФ Simplify: If we still must do this activity, can we make it faster with a better tool, position, or method?
Run through 76 activities, this is mechanical work тАФ not glamorous, but devastating in effect. Within two weeks of analysis, we had identified:
- Eliminate candidates: 6 activities (chamber close-and-reopen sequences, redundant cleanings)
- Combine candidates: 4 activities (shutter cleaning combined into single pass)
- Rearrange candidates: 11 activities (tool fetching, wire spool fetching, masking tape fetching тАФ all moved offline)
- Simplify candidates: 8 activities (better scrappers, dedicated tool boxes, pre-cut graphite tape)
Just the eliminations and rearrangements alone тАФ without any new equipment тАФ projected a saving of about 12 minutes per cycle. We were already at 50 minutes on paper before we touched a single tool.
ЁЯУж The Tool Box System тАФ Our First Real Win
Once we listed the 11 "rearrange" candidates, a pattern emerged: most of them were operators walking to fetch something. Tool, wire, tape, graphite, scrapper. The fix had to be obvious. Stage everything before the chamber opens.
We designed a 3-tool-box system specific to MET-1:
| Box | Position | Size | Tools (Quantity) |
|---|---|---|---|
| Box 1 тАФ Inside chamber | Inside chamber, fixed mount | 16 ├Ч 4 ├Ч 4 inch | Round chisel rod (1), Scrapper plate 1-foot (1), Small scrapper 9-inch (2), Screw driver (1), Plier (1) |
| Box 2 тАФ Inside chamber | Inside chamber, fixed mount | 9 ├Ч 6 ├Ч 6 inch | Guide pipe (2), Copper clamp set (1) |
| Box 3 тАФ Outside on carriage | Bolted on the carriage | 16 ├Ч 8 ├Ч 4 inch | Spanner 14/15/16 (3), L-N key 4/5/6/8/10 (set), Nut and bolt for chamber closing (2 sets) |
The boxes had two effects we did not anticipate. First, the obvious: zero tool-fetching time. Second, the deeper one: operators stopped sharing tools. Each station had its own. The "where is the scrapper?" delays disappeared because the scrapper was always in the same slot.
Within one week of installing the boxes, our average dropped from 60 to 55 minutes. Not from changing what we did. Just from removing the search-and-fetch.
ЁЯУЛ The 1-Hour Prior Check List тАФ 22 Items, Zero Surprises
Tool boxes solved the in-chamber search. But what about the items operators had to fetch from outside the machine area? Boats. Wire spools. Graphite tape. Bubble film. Adhesive tape. Old-boat dumping box.
We documented every "what do you need before chamber opens?" item and built a single sheet тАФ the Operator Instructions 1 Hour Prior to Chamber Opening. 22 items in total, divided across three operators by responsibility:
A note on Operator 2: Operator 2 is the source assistant тАФ they work alongside Operator 1 during the actual changeover, sharing the same tool boxes, the same workspace, and supporting boat removal, graphite paint application, and clamp work. They do not have a separate offline check list because their role is purely "during changeover" rather than "before changeover". Operator 1 handles the offline prep on behalf of both source-side operators.
Operator 1 (Source) responsibilities (13 items):
- Tool box ready (Boxes 1, 2, 3 verified)
- Boats and graphite tape availability confirmed
- Boats and graphite tape unpacked and ready to use
- Aluminium wire cut ready (pre-cut to length)
- Graphite paste bucket available
- Bubble film ready
- Pneumatic vibrator ready (if required)
- Vacuum cleaner ready
- Adhesive tapes ready
- Gloves worn
- Box for old boats dumping (in position)
- Wire spools available and nearby
- Slitting plan + OD targets verified (production plan known to changeover lead)
Operator 3 (Loading/Unloading) responsibilities (5 items):
- Film cutter available
- Unwinder roll ready for loading with winding shaft inside it
- New core ready (optional)
- Graphite paste bucket available
- Apron ready with required tools
Other (4 items): Tool box ready confirmation, gloves worn, crane in correct position, masking tape pre-cut.
The check list was filled in by the shift in-charge one hour before the planned chamber opening. If even one item was missing, the boat change was delayed. This was non-negotiable. The check list saved more time than any tool change because it eliminated the discovery delays тАФ the moments mid-changeover when somebody realised they needed something that was 5 minutes away.
ЁЯУК The Step 1 Progression тАФ 8 Weeks of Real Data
Here is the actual week-by-week boat change time from our project records. Note the variation тАФ some days were better than others, but the trend line was unmistakable:
| Date | Time (min) | Notes |
|---|---|---|
| Start (baseline) | 65 | 3-month historical average |
| 20 July 2017 | 60 | Initial measurement after team formed |
| 21-23 July | 60-60-60 | Tool boxes designed, not yet installed |
| 28 July | 55 | Tool boxes installed in chamber |
| 29-31 July | 60-55-56 | Variation as operators learn new system |
| 2-4 August | 61-55-47 | Check list rolled out from 4 August |
| 5 August | 45 | First sub-50 result |
| 8-12 August | 43-47-43 | Stable in mid-40s |
| 13-17 August | 43-39-38 | First sub-40 result on 17 August |
| 21 August | 45-39 | Step 1 final week |
| Step 1 final average | 38 min | Reduction of 27 min from baseline (42% saving) |
Three things are worth noticing in this progression. First, change was not linear. There were bad days тАФ 60 minutes on 29 July after a 55 the day before. We did not panic. Bad days are part of learning. Second, the big drops happened after specific interventions тАФ the tool boxes installation, the check list rollout, the meeting where we redrew the operator role split. Third, by week 6 we were consistently below 45 minutes. Step 1 was working.
ЁЯОп Step 2 тАФ From 38 to 35 Minutes
By mid-August, our 38-minute average had stabilised. The team leader called a Step 2 review meeting on 15 August 2017 with a new target: 30 minutes. We were ambitious. We did not quite get there. But we did get to 35.
Step 2 was harder than Step 1. The easy waste тАФ the search-and-fetch, the chamber close-and-reopen, the duplicate cleanings тАФ was already gone. What remained was real work, and getting faster meant micro-choreography.
What we did in Step 2:
- 3 shafts arranged for offline activity. The unwinder shaft, rewinder shaft, and a spare were pre-staged. Operator 3 no longer searched for shafts.
- Video re-recorded after Step 1 changes. I filmed a new boat change at the 38-minute level and we found 6 more "rearrange" candidates and 3 more "simplify" candidates.
- 2 graphite buckets made available. One for source, one for drum shield work. Two operators stopped waiting for the same bucket.
- Bubble film spreading inside chamber. Pre-staged on a tray of half boat-section length. No more crumpling and re-spreading.
- Boat section divided into 2 equal parts. Operator 1 took one half, Operator 2 took the other. They worked in parallel on cleaning instead of one waiting for the other.
- Unwinder ready with masking tape. Pre-applied tape eliminated the "got tape" 90-second walk.
- A set of new tools arranged. Including a custom clamp face cleaner that did 3 clamps per minute (versus 30 seconds per clamp manually).
The Step 2 progression over 4 weeks:
| Date | Time (min) | Notes |
|---|---|---|
| Step 2 start | 52 | Re-baseline before Step 2 changes |
| 22-26 August | 50-48-45-41 | 3-shaft + 2-bucket + tape pre-stage |
| 28-30 August | 40-37-38 | Sub-40 stable |
| 2-7 September | 45-42-36-36 | Best week тАФ three sub-37 results |
| Step 2 final average | 35 min | Reduction of 30 min from original baseline (46% saving) |
ЁЯУЛ Activity-Level Time Study тАФ Where the Minutes Actually Go
For readers who want to see the work at the second-by-second level, here is what one operator actually does during a boat change. This is from my actual 11 September 2017 video documentation, not theoretical estimates.
Operator 1 (Source Section) тАФ 31 activities, 35:43 total time:
| # | Activity | Time | ECRS Action |
|---|---|---|---|
| 1 | Chamber Opening | 0:50 | Internal тАФ physics |
| 4 | Tool Taking | 0:23 | Eliminated by tool box system |
| 5,7 | Shutter Cleaning Outside + Inside | 0:55 + 1:06 | Combined into single pass |
| 10,12,14 | Boat section cleaning by scrapper (3 rounds) | 0:55 + 1:12 + 5:00 | Combined to 1 round + simplified scrapper |
| 11 | Boat section + guide pipe cleaning by rod | 3:40 | Internal тАФ must do |
| 13 | Boat removal | 0:16 | Internal тАФ physics |
| 15 | Getting air tube | 0:21 | Eliminated тАФ air tube control valve and location defined |
| 16 | Cleaning by air tube | 2:41 | Internal тАФ must do |
| 18,25 | Graphite paint on boat section (2 passes) | 1:35 + 0:40 | Internal тАФ must do |
| 20 | Boat mounting | 4:54 | Internal тАФ must do (longest single activity) |
| 26 | Wire movement checking | 1:50 | Internal тАФ must do |
| 28-31 | Chamber closing тЖТ opening тЖТ shield setting тЖТ closing again | 2:01 | Eliminated тАФ proper sequencing prevents this |
Through ECRS, Operator 1's total dropped from 35:43 to 31:35 тАФ about 4 minutes off. Multiplied across 3 operators with overlapping ECRS gains, the choreography improved enough to drop 25+ minutes from the overall changeover.
The single most powerful insight from the activity table: boat mounting itself takes nearly 5 minutes and there is no way to compress that without changing the source design. We accepted this as a hard floor. Everything else became negotiable.
ЁЯТб What Worked, What Did Not
Looking back, here are the lessons that translate to any plant:
What worked. Filming an actual changeover and watching it back with the team. Nobody could deny what they saw. The "we already do that efficiently" defence collapsed in the face of video evidence. Tool boxes near the work, not in a tool room. Pre-staging the consumables an hour before chamber opening. Splitting the source section into two halves so two operators could work in parallel. Ending the day's data with a number тАФ every shift wrote down their boat change time, and the number became part of operator pride.
What did not work, at least not at first. Top-down instructions without operator input. We tried this in the first week and got resistance. The choreography only stuck once operators redesigned it themselves тАФ we provided the framework (ECRS, video, time data), they did the actual sequencing. The crane movement problem persisted through the entire project тАФ we identified 2-3 minute delays from imprecise crane positioning, but the electrical fix was capex-dependent and did not happen during our window. The chamber closing problem (3-4 minute occasional delay) was similar тАФ mechanical fix needed.
If I were doing this project again today, I would start with video on Day 1, get the team's buy-in by Week 2, install tool boxes by Week 3, and start tracking daily numbers from Week 4. Everything else flows from those four steps.
ЁЯФД How to Apply This in Your Plant
If you are reading this and your boat change is still 60+ minutes, you have a 25-30 minute opportunity sitting in plain sight. Here is how to start, in the same week-by-week way we did it.
Week 1 тАФ Film and document. Borrow a smartphone or get a small video camera. Record one complete boat change from start to finish. Sit down with your team and watch it back, stopwatch in hand. Log every distinct activity in a spreadsheet тАФ name, start time, end time, duration. Do this for two more boat changes that week. You will end Week 1 with a 60-80 row activity table that nobody in your plant has ever seen before.
Week 2 тАФ Run ECRS analysis. Take your activity table and add four columns: Eliminate, Combine, Rearrange, Simplify. Go row by row, marking which actions apply. The team should do this together тАФ operators have insights you do not. Expect to find 8-15 activities that can be eliminated entirely, another 5-10 that can be combined, and 10-15 that can be rearranged offline. This is your project plan.
Week 3 тАФ Install the offline prep system. The two highest-ROI changes are tool boxes and the 1-Hour Prior Check List. Tool boxes do not need to be expensive тАФ even cardboard boxes labeled clearly will work for the first month. Position them where the work happens, not in a separate room. The check list should fit on one A4 page and be filled in by the shift in-charge one hour before chamber opens. Items not ready means the changeover gets delayed by an hour. This is non-negotiable for the system to work.
Week 4 тАФ Roll out the new choreography. Split your operators into clear roles: Person 1 owns source, Person 2 owns loading/unloading, Person 3 (typically a trainee or a floating helper) handles offline prep and during-changeover support. Document the choreography on a single page. Post it at the machine. Track every changeover time. Do not aim for the 35-minute target on day one тАФ aim for "consistently under 50 minutes" in the first month, then push down from there.
Months 2-3 тАФ Step 2 refinement. Once you are stable in the 40s, film again. Look for the next layer of waste. The remaining 5-10 minute opportunity comes from second-level choreography тАФ division of labour within source section, parallel work between operators, micro-task ordering. This is the harder phase, but the ground rules are the same: ECRS, video, daily numbers.
ЁЯТ░ The Honest Economics тАФ 3 Lenses
Most SMED articles use a single number for savings. The honest answer depends on the lens you use.
Lens 1 тАФ Raw production time recovered. 25-30 minutes saved per cycle, 1.34 cycles per day per machine = 35-40 minutes recovered per day per machine = ~18-20 hours per month per machine. For a 2-machine plant, ~36-40 hours of monthly capacity recovered. This is mathematically uncontestable.
Lens 2 тАФ Realistic extra jumbos delivered. Raw time does not become extra jumbos one-to-one. Next-stage limits (slitter, packaging, dispatch) typically capture 30-40% of the raw potential. Realistic delivery: 2-3 extra jumbos per month per plant from boat-set changes alone. At тВ╣15,000-20,000 contribution margin per jumbo, that is тВ╣3-6 lakh of additional monthly margin.
Lens 3 тАФ OEE improvement. Boat-set changes alone (the focus of this blog) drop setup time by 1-2 percentage points of the 1,440-minute day. The bigger OEE win comes when these same techniques are applied to inter-cycle changeovers, which add another 14-16 percentage points of OEE recovery. The combined effect (boat-set + inter-cycle SMED) typically lands at +15 to +18 percentage points of OEE Availability. For most management dashboards, that is the number that matters most.
For our 2017 project specifically, we calculated savings of 15 min per day per machine, which translated to 4 tonnes of additional metallised film per month. That number was conservative тАФ measuring savings as recovered production time rather than recovered minutes alone gives a clearer picture.
ЁЯФм Common Objections тАФ Honest Answers
"Our metalliser is different тАФ these times do not apply." The physics floor (15-16 minutes minimum for vent, pump, source verify, film handling) is universal. Your starting baseline may be 50 min or 80 min тАФ the percentage saving from ECRS-based work is the same. We saw 42-46% reduction. You will likely see 30-50%.
"We do not have a third operator dedicated to changeover." Then your realistic target is 45 minutes, not 35. The 3-person choreography is not optional for breaking 40 minutes. If headcount is the constraint, do the math on whether one extra dedicated changeover person (тВ╣3-5 lakh annual salary) pays for itself via 2-3 extra jumbos per month worth тВ╣3-6 lakh per month. The answer is almost always yes.
"Operators will not follow a written choreography." They will, once they see the changeover is shorter and less stressful. Most operators hate long changeovers тАФ long means rushed, rushed means mistakes. A choreographed 35-minute changeover with clear roles is calmer than an improvised 65-minute one with three people bumping into each other. Critically, the operators must redesign the choreography themselves тАФ top-down imposition fails. The supervisor's job is to enforce the choreography once defined, not to invent it.
"We tried SMED before and it did not stick." SMED fails when implemented without the daily measurement step. We posted boat change time on a board every shift. The number became operator pride. Without that visible accountability, any SMED gain regresses within months.
"What if we have crane / chamber / electrical issues like you did?" Document them, escalate to maintenance, and continue with the SMED work. Capex-dependent issues are not your project's responsibility to solve тАФ they belong on a separate parallel track. Our crane and chamber issues persisted through our entire project. We still hit 35 minutes. The capex fix would have brought us to 30.
If your team has questions not answered above, the answers are almost always in your own video footage and time-stamped activity log. That is exactly why filming and documenting is the foundation of any SMED project.
ЁЯУе Download the VKS Tech SMED Action Card (PDF)
A 6-page printable kit built from the 2017 MET-1 project тАФ everything you need to start your own SMED journey this month:
- Pages 1-3 (Reference): ECRS method, 3 tool box specs, 8-week progression data, activity-level time study, 4-week implementation guide
- Page 4 (Blank Format 1): 1-Hour Prior Check List with 21 empty tick boxes тАФ print one per shift, fill before chamber opens
- Page 5 (Blank Format 2): Daily Boat Change Time Log тАФ 22 blank rows for the month, with monthly summary section. Post on the wall.
- Page 6 (Blank Format 3): ECRS Analysis Worksheet тАФ film a changeover, list every activity, mark E/C/R/S, identify 20-40 changes
Print pages 4-6, photocopy as needed, hand to your shift in-charge. The Action Card is your 8-week SMED kit.
ЁЯЪА рдореИрдВрдиреЗ Metalliser Boat Change Time рдХреЛ 65 рд╕реЗ 35 Minutes рддрдХ рдХреИрд╕реЗ рд▓рд╛рдпрд╛ тАФ рдПрдХ 2017 Case Study
ЁЯУЦ 20-min read | Real Plant Case Study | April 2026 рдореЗрдВ published | Reference рдХреЗ рд▓рд┐рдП bookmark рдХрд░реЗрдВ
July 2017 рдореЗрдВ, рд╣рдорд╛рд░рд╛ metalliser boat change average 65 minutes рд▓реЗрддрд╛ рдерд╛ред рдЖрда рд╣рдлреНрддреЗ рдмрд╛рдж, рд╣рдордиреЗ рд╡рд╣реА 35 minutes рдореЗрдВ рдХрд┐рдпрд╛ред рди рдирдпреА machine, рди capex, рди floor рдкрд░ consultantsред рдмрд╕ video, ECRS analysis, tool boxes, check lists, рдФрд░ рдПрдХ team рдЬрд┐рд╕рдиреЗ рддрдп рдХрд┐рдпрд╛ рдХрд┐ 65 minutes рдЕрдм acceptable рдирд╣реАрдВ рд╣реИред
рдпреЗ blog рдЖрдкрдХреЛ рдмрддрд╛рддрд╛ рд╣реИ exactly рдХреИрд╕реЗ рд╣реБрдЖ тАФ week by week, activity by activity, mistake by mistakeред рдореИрдВрдиреЗ project рдореЗрдВ documentation lead рдХрд┐рдпрд╛ as the metallizer engineerред рдореИрдВрдиреЗ рд╣рд░ changeover film рдХрд┐рдпрд╛, рд╣рд░ activity seconds рдореЗрдВ time рдХреА, рдФрд░ рд╣рд░ meeting рдореЗрдВ рдмреИрдард╛ рдЬрд╣рд╛рдБ рд╣рдордиреЗ process рдХреЛ рдЯреБрдХрдбрд╝реЛрдВ рдореЗрдВ рддреЛрдбрд╝рд╛ред рдЗрд╕ blog рдореЗрдВ data рдФрд░ progression real рд╣реИ, original 2017 project records рд╕реЗ рд▓рд┐рдпрд╛ рд╣реБрдЖред
рдЕрдЧрд░ рдЖрдЬ рдЖрдк India рдореЗрдВ рдПрдХ metalliser plant рдЪрд▓рд╛ рд░рд╣реЗ рд╣реИрдВ рдФрд░ рдЖрдкрдХрд╛ boat change рдЕрднреА рднреА 60+ minutes рд▓реЗрддрд╛ рд╣реИ, рдпреЗ playbook рд╣реИред 2017 рд╕реЗ technical environment рдЬрд╝реНрдпрд╛рджрд╛ рдирд╣реАрдВ рдмрджрд▓рд╛ рд╣реИ тАФ рд╡рд╣реА boats, рд╡рд╣реА vacuum systems, рд╡рд╣реА operator pressuresред рд╣рдордиреЗ рддрдм рдЬреЛ рдХрд┐рдпрд╛ рд╡реЛ рдЖрдЬ рднреА рдЖрдкрдХреЗ plant рдореЗрдВ рдХрд╛рдо рдХрд░реЗрдЧрд╛ред
рдореИрдВ рдпреЗ April 2026 рдореЗрдВ рд▓рд┐рдЦ рд░рд╣рд╛ рд╣реВрдБ, original MET-1 project рдХреЗ рдиреМ рд╕рд╛рд▓ рдмрд╛рджред рдЗрди рд╕рд╛рд▓реЛрдВ рдореЗрдВ, рдореИрдВрдиреЗ India рдХреЗ рдХрдИ plants рдкрд░ similar SMED methodology apply рд╣реЛрддреЗ рджреЗрдЦреА рд╣реИ, рдФрд░ results consistently 30-50 percent reduction range рдореЗрдВ land рд╣реЛрддреЗ рд╣реИрдВред рдЗрд╕ blog рдореЗрдВ present 2017 рдХрд╛ data real plant history рд╣реИред Frameworks 2026 рдореЗрдВ operate рдХрд░ рд░рд╣реЗ рдХрд┐рд╕реА рднреА metalliser plant рдкрд░ directly translate рд╣реЛрддреЗ рд╣реИрдВред
- Starting point: 65 min average (June-July 2017 baseline)
- Step 1 result: 38 min average (8 weeks, ECRS + tool boxes + check lists)
- Step 2 result: 35 min average (4 рдФрд░ weeks, video re-analysis)
- Total project time: 12 weeks, zero capex
- Method: ECRS (Eliminate, Combine, Rearrange, Simplify) + 3 operators + 4-zone offline prep
ЁЯУН July 2017 рдХреА Problem
рд╣рдорд╛рд░реА team рдХреЛ рдЙрд╕ рдорд╣реАрдиреЗ рдПрдХ clear directive рдорд┐рд▓рд╛: MET-1 рдкреЗ boat change time рдХрдо рдХрд░реЛред рд╕рд╡рд╛рд▓ рдпреЗ рдирд╣реАрдВ рдерд╛ рдХрд┐ рдХреНрдпрд╛ рд╣рдо рдХрд░ рд╕рдХрддреЗ рд╣реИрдВ тАФ рд╕рд╡рд╛рд▓ рдерд╛ рдХрд┐ рдХреНрдпрд╛ рд╣рдо рдХреБрдЫ рдирдпрд╛ рдЦрд░реАрджреЗ рдмрд┐рдирд╛ рдХрд░ рд╕рдХрддреЗ рд╣реИрдВред
Numbers рд╣рдорд╛рд░реА рддрд░рдл рджреЗрдЦ рд░рд╣реЗ рдереЗ:
- рдкрд┐рдЫрд▓реЗ 3 рдорд╣реАрдиреЛрдВ рдХрд╛ average boat change time: 65 minutes
- рд╣рд░ рджрд┐рди boat changes: рд╣рд░ machine рд▓рдЧрднрдЧ 1.3 events
- рд╕рд┐рд░реНрдлрд╝ boat changes рд╕реЗ daily downtime: ~85 minutes per machine
- рд╣рд░ minute saved per cycle: 1.3 minutes saved per day, ~40 minutes per month
рдЕрдЧрд░ рд╣рдо 25 minutes per cycle рдХрд╛рдЯ рд╕рдХрддреЗ, рд╣рдо рд▓рдЧрднрдЧ 13 hours per month per machine recover рдХрд░рддреЗ тАФ 3 рд╕реЗ 4 extra production jumbos рдХреЗ рд▓рд┐рдП рдХрд╛рдлрд╝реАред рд╣рдорд╛рд░реЗ 2-machine plant рдкреЗ, рдЗрд╕рдХрд╛ рдорддрд▓рдм рд╣рд░ рдорд╣реАрдиреЗ 6-8 extra jumbos zero capex рдХреЗ рд╕рд╛рдеред
рд╣рдорд╛рд░реА team 10 рд▓реЛрдЧреЛрдВ рдХреА рдереА: рдПрдХ mentor, рдПрдХ team leader, рдореИрдВ documentation lead (the metallizer engineer), рдФрд░ 7 operators рд╕рд╛рд░реА shifts рд╕реЗред рд╣рдо Monday рдФрд░ Thursday 4 PM рдкрд░ meeting рдХрд░рддреЗ рдереЗред рд╣рдорд╛рд░рд╛ brief simple рдерд╛: 3 рдорд╣реАрдиреЛрдВ рдореЗрдВ average 50 minutes рддрдХ рд▓рд╛рдУред
ЁЯУ╣ Week 1 тАФ рдЬрд┐рд╕ рджрд┐рди рд╣рдордиреЗ рдЦреБрдж рдХреЛ Film рдХрд┐рдпрд╛
рдкрд╣рд▓реА рдЪреАрдЬрд╝ рдЬреЛ рдореИрдВрдиреЗ рдХреА рд╡реЛ рдереА video camera set up рдХрд░рдХреЗ рдПрдХ actual boat change start to finish record рдХрд░рдирд╛ред рдореИрдВ рдЙрдореНрдореАрдж рдХрд░ рд░рд╣рд╛ рдерд╛ рдХреБрдЫ obvious problems рдорд┐рд▓реЗрдВрдЧреАред рдЬреЛ рдорд┐рд▓рд╛ рд╡реЛ uncomfortable рдерд╛ред
Video stopwatch рдХреЗ рд╕рд╛рде рджреЗрдЦрддреЗ рд╣реБрдП, рдореИрдВрдиреЗ рдЕрдХреЗрд▓реЗ Operator 1 рдХреЗ рд▓рд┐рдП 31 activities log рдХреАрдВ тАФ рдФрд░ Operator 2 рдХреЗ рд▓рд┐рдП 22 in source-section work, plus Operator 3 рдХреЗ рд▓рд┐рдП 23 loading рдФрд░ unloading side рдкреЗред рддреАрдиреЛрдВ operators рдХреЗ рдорд┐рд▓рд╛рдХрд░ рдПрдХ boat change рдореЗрдВ 76 distinct activities рдереАрдВред рдЬрд╝реНрдпрд╛рджрд╛рддрд░ productive рджрд┐рдЦ рд░рд╣реА рдереАрдВред рдХреБрдЫ рдирд╣реАрдВ рдереАрдВред
Video рдиреЗ рд╣рдореЗрдВ рдкрд╛рдБрдЪ рдРрд╕реА рдЪреАрдЬрд╝реЗрдВ рджрд┐рдЦрд╛рдИрдВ рдЬреЛ рд╣рдо рдорд╛рдирдирд╛ рдирд╣реАрдВ рдЪрд╛рд╣рддреЗ рдереЗ:
- Tool taking тАФ 23 secondsред Operator 1 tool stand рддрдХ рдЪрд▓рд╛, tools рдЙрдард╛рдП, рд╡рд╛рдкрд╕ рдЖрдпрд╛ред рд╣рд░ cycleред рд╣рд░ рдмрд╛рд░ред
- Boat section cleaning by scrapper 3 рдмрд╛рд░ repeat рд╣реБрдЖред Activity log рдХреА Lines 10, 12, 14 рдиреЗ 55, 72, 300 seconds рд▓рд┐рдПред рддреАрди rounds рдХреНрдпреЛрдВ? рдХреНрдпреЛрдВрдХрд┐ scrapper share рд╣реЛ рд░рд╣рд╛ рдерд╛, рдЧрд┐рд░ рд░рд╣рд╛ рдерд╛, рдЙрдард╛рдпрд╛ рдЬрд╛ рд░рд╣рд╛ рдерд╛, рджреВрд╕рд░реЗ operator use рдХрд░ рд░рд╣реЗ рдереЗ, рдлрд┐рд░ рдЙрдард╛рдпрд╛ рдЬрд╛ рд░рд╣рд╛ рдерд╛ред
- Chamber close рд╣реБрдЖ, рдлрд┐рд░ open рд╣реБрдЖ, рдлрд┐рд░ close рд╣реБрдЖред Operator 1 рдХреЗ log рдХреА Lines 28-31: chamber closing (46s), chamber opening (37s), shield setting and checking (148s), chamber closing again (50s) тАФ 281 seconds рдмрд░реНрдмрд╛рдж рдХреНрдпреЛрдВрдХрд┐ рдХреЛрдИ рдкрд╣рд▓реА рдмрд╛рд░ close рд╕реЗ рдкрд╣рд▓реЗ shield setting рдХрд░рдирд╛ рднреВрд▓ рдЧрдпрд╛ред
- Operator 3 рдХрд╛ drum cleaning тАФ 4 minutes 35 secondsред рдЬрд╝рд░реВрд░реА рдХрд╛рдо, рд▓реЗрдХрд┐рди Operator 1 рдХреЗ source work рдХреЗ рд╕рд╛рде properly choreograph рдирд╣реАрдВ рдерд╛ред рджреЛрдиреЛрдВ zones рдПрдХ-рджреВрд╕рд░реЗ рд╕реЗ рдЯрдХрд░рд╛ рд░рд╣реЗ рдереЗред
- "Got tape" тАФ 1 minute 30 secondsред Operator 3 floor рдкрд╛рд░ рдХрд░рдХреЗ masking tape рдХрд╛ roll рд▓рд╛рдпрд╛, рд╡рд╛рдкрд╕ рдЖрдпрд╛ред рд╣рд░ cycleред
рдЙрд╕ moment рдореБрдЭреЗ realise рд╣реБрдЖ рдХрд┐ 65 minutes рд╣рдорд╛рд░реЗ equipment рдХреА problem рдирд╣реАрдВ рдереАред рдпреЗ problem рдереА рдХреИрд╕реЗ рд╣рдо рдЕрдкрдирд╛ рдХрд╛рдо organise рдХрд░рддреЗ рдереЗред рд╡рд╣реА operators, рд╡рд╣реА physical tasks, 40 minutes рдореЗрдВ finish рдХрд░ рджреЗрддреЗ рдЕрдЧрд░ choreography рд╕рд╣реА рд╣реЛрддреАред
ЁЯЫая╕П ECRS Discipline тАФ Eliminate, Combine, Rearrange, Simplify
рд╣рдорд╛рд░реЗ team leader рдиреЗ рд╣рдореЗрдВ ECRS рд╕реЗ introduce рдХрд┐рдпрд╛ тАФ рдПрдХ Toyota-origin technique activity analysis рдХреЗ рд▓рд┐рдПред рд╣рдорд╛рд░реЗ 76-row activity log рдХреА рд╣рд░ single activity рдХреЗ рд▓рд┐рдП, рд╣рдо order рдореЗрдВ рдЪрд╛рд░ рд╕рд╡рд╛рд▓ рдкреВрдЫрддреЗ:
- E тАФ Eliminate: рдХреНрдпрд╛ рдпреЗ activity outcome рдХреЛ рдиреБрдХрд╝рд╕рд╛рди рдкрд╣реБрдБрдЪрд╛рдП рдмрд┐рдирд╛ рдкреВрд░реА рд╣рдЯрд╛рдпреА рдЬрд╛ рд╕рдХрддреА рд╣реИ?
- C тАФ Combine: рдХреНрдпрд╛ рдпреЗ activity рдХрд┐рд╕реА рджреВрд╕рд░реА рд╕реЗ merge рд╣реЛ рд╕рдХрддреА рд╣реИ, рдмреАрдЪ рдХрд╛ transition рд╣рдЯрд╛рддреЗ рд╣реБрдП?
- R тАФ Rearrange: рдХреНрдпрд╛ рдпреЗ activity sequence рдореЗрдВ рдХрд┐рд╕реА рдФрд░ point рдкреЗ move рд╣реЛ рд╕рдХрддреА рд╣реИ (especially: рдХреНрдпрд╛ рдпреЗ chamber open рд╣реЛрдиреЗ рд╕реЗ рдкрд╣рд▓реЗ рд╣реЛ рд╕рдХрддреА рд╣реИ)?
- S тАФ Simplify: рдЕрдЧрд░ рдпреЗ activity рдлрд┐рд░ рднреА рдХрд░рдиреА рдЬрд╝рд░реВрд░реА рд╣реИ, рдХреНрдпрд╛ рдЗрд╕реЗ better tool, position, рдпрд╛ method рд╕реЗ faster рдмрдирд╛рдпрд╛ рдЬрд╛ рд╕рдХрддрд╛ рд╣реИ?
76 activities рдХреЗ through рдЬрд╛рдирд╛ mechanical work рд╣реИ тАФ glamorous рдирд╣реАрдВ, рд▓реЗрдХрд┐рди devastating effect рд╡рд╛рд▓рд╛ред Analysis рдХреЗ рджреЛ рд╣рдлреНрддреЛрдВ рдХреЗ рдЕрдВрджрд░, рд╣рдордиреЗ identify рдХрд░ рд▓рд┐рдпрд╛ рдерд╛:
- Eliminate candidates: 6 activities (chamber close-and-reopen sequences, redundant cleanings)
- Combine candidates: 4 activities (shutter cleaning combined into single pass)
- Rearrange candidates: 11 activities (tool fetching, wire spool fetching, masking tape fetching тАФ рд╕рдм offline move рд╣реЛ рдЧрдпреАрдВ)
- Simplify candidates: 8 activities (better scrappers, dedicated tool boxes, pre-cut graphite tape)
рд╕рд┐рд░реНрдлрд╝ eliminations рдФрд░ rearrangements рдЕрдХреЗрд▓реЗ тАФ рдХрд┐рд╕реА рдирдП equipment рдХреЗ рдмрд┐рдирд╛ тАФ per cycle рд▓рдЧрднрдЧ 12 minutes saving project рдХрд░ рд░рд╣реЗ рдереЗред рдПрдХ рднреА tool рдХреЛ рд╣рд╛рде рд▓рдЧрд╛рдиреЗ рд╕реЗ рдкрд╣рд▓реЗ рд╣рдо paper рдкреЗ 50 minutes рдкрд░ рдереЗред
ЁЯУж Tool Box System тАФ рд╣рдорд╛рд░реА рдкрд╣рд▓реА Real Win
рдПрдХ рдмрд╛рд░ рдЬрдм рд╣рдордиреЗ 11 "rearrange" candidates list рдХрд░ рд▓реА, рдПрдХ pattern emerge рд╣реБрдЖ: рдЬрд╝реНрдпрд╛рджрд╛рддрд░ operators рдХреБрдЫ fetch рдХрд░рдиреЗ рдХреЗ рд▓рд┐рдП рдЪрд▓ рд░рд╣реЗ рдереЗред Tool, wire, tape, graphite, scrapperред Fix obvious рд╣реЛрдирд╛ рдЪрд╛рд╣рд┐рдП рдерд╛ред Chamber open рд╣реЛрдиреЗ рд╕реЗ рдкрд╣рд▓реЗ рд╕рдм рдХреБрдЫ stage рдХрд░реЛред
рд╣рдордиреЗ MET-1 рдХреЗ рд▓рд┐рдП specific 3-tool-box system design рдХрд┐рдпрд╛:
| Box | Position | Size | Tools (Quantity) |
|---|---|---|---|
| Box 1 тАФ Inside chamber | Inside chamber, fixed mount | 16 ├Ч 4 ├Ч 4 inch | Round chisel rod (1), Scrapper plate 1-foot (1), Small scrapper 9-inch (2), Screw driver (1), Plier (1) |
| Box 2 тАФ Inside chamber | Inside chamber, fixed mount | 9 ├Ч 6 ├Ч 6 inch | Guide pipe (2), Copper clamp set (1) |
| Box 3 тАФ Outside on carriage | Bolted on the carriage | 16 ├Ч 8 ├Ч 4 inch | Spanner 14/15/16 (3), L-N key 4/5/6/8/10 (set), Nut and bolt for chamber closing (2 sets) |
Boxes рдХреЗ рджреЛ effects рдереЗ рдЬреЛ рд╣рдордиреЗ anticipate рдирд╣реАрдВ рдХрд┐рдП рдереЗред рдкрд╣рд▓рд╛ obvious рдерд╛: zero tool-fetching timeред рджреВрд╕рд░рд╛ deeper рдерд╛: operators рдиреЗ tools share рдХрд░рдирд╛ рдмрдВрдж рдХрд░ рджрд┐рдпрд╛ред рд╣рд░ station рдХрд╛ рдЕрдкрдирд╛ рдерд╛ред "Scrapper рдХрд╣рд╛рдБ рд╣реИ?" delays рдЧрд╛рдпрдм рд╣реЛ рдЧрдпреАрдВ рдХреНрдпреЛрдВрдХрд┐ scrapper рд╣рдореЗрд╢рд╛ same slot рдореЗрдВ рдерд╛ред
Boxes install рд╣реЛрдиреЗ рдХреЗ рдПрдХ рд╣рдлреНрддреЗ рдХреЗ рдЕрдВрджрд░, рд╣рдорд╛рд░рд╛ average 60 рд╕реЗ 55 minutes рддрдХ drop рд╣реЛ рдЧрдпрд╛ред рд╣рдордиреЗ рдЬреЛ рдХрд┐рдпрд╛ рдЙрд╕реЗ рдмрджрд▓рдиреЗ рд╕реЗ рдирд╣реАрдВред рдмрд╕ search-and-fetch рд╣рдЯрд╛рдиреЗ рд╕реЗред
ЁЯУЛ 1-Hour Prior Check List тАФ 22 Items, Zero Surprises
Tool boxes рдиреЗ in-chamber search solve рдХрд░ рджрд┐рдпрд╛ред рд▓реЗрдХрд┐рди рдЙрди items рдХрд╛ рдХреНрдпрд╛ рдЬреЛ operators рдХреЛ machine area рдХреЗ рдмрд╛рд╣рд░ рд╕реЗ fetch рдХрд░рдиреЗ рдкрдбрд╝рддреЗ рдереЗ? Boatsред Wire spoolsред Graphite tapeред Bubble filmред Adhesive tapeред Old-boat dumping boxред
рд╣рдордиреЗ рд╣рд░ "chamber open рд╣реЛрдиреЗ рд╕реЗ рдкрд╣рд▓реЗ рдХреНрдпрд╛ рдЪрд╛рд╣рд┐рдП?" item document рдХрд┐рдпрд╛ рдФрд░ рдПрдХ single sheet рдмрдирд╛рдпреА тАФ Operator Instructions 1 Hour Prior to Chamber Openingред Total 22 items, рддреАрди operators рдореЗрдВ responsibility рдХреЗ рд╣рд┐рд╕рд╛рдм рд╕реЗ divided:
Operator 2 рдХреЗ рдмрд╛рд░реЗ рдореЗрдВ note: Operator 2 source assistant рд╣реИ тАФ рд╡реЛ actual changeover рдХреЗ рджреМрд░рд╛рди Operator 1 рдХреЗ рд╕рд╛рде рдХрд╛рдо рдХрд░рддрд╛ рд╣реИ, same tool boxes, same workspace share рдХрд░рддреЗ рд╣реБрдП, рдФрд░ boat removal, graphite paint application, clamp work рдореЗрдВ support рджреЗрддреЗ рд╣реБрдПред рдЙрд╕рдХрд╛ рдХреЛрдИ separate offline check list рдирд╣реАрдВ рд╣реИ рдХреНрдпреЛрдВрдХрд┐ рдЙрд╕рдХрд╛ role purely "during changeover" рд╣реИ, "before changeover" рдирд╣реАрдВред Operator 1 рджреЛрдиреЛрдВ source-side operators рдХреЗ рд▓рд┐рдП offline prep handle рдХрд░рддрд╛ рд╣реИред
Operator 1 (Source) responsibilities (13 items):
- Tool box ready (Boxes 1, 2, 3 verified)
- Boats and graphite tape availability confirmed
- Boats and graphite tape unpacked and ready to use
- Aluminium wire cut ready (pre-cut to length)
- Graphite paste bucket available
- Bubble film ready
- Pneumatic vibrator ready (рдЕрдЧрд░ required)
- Vacuum cleaner ready
- Adhesive tapes ready
- Gloves worn
- Box for old boats dumping (in position)
- Wire spools available рдФрд░ nearby
- Slitting plan + OD targets verified (changeover lead рдХреЛ production plan рдорд╛рд▓реВрдо рд╣реИ)
Operator 3 (Loading/Unloading) responsibilities (5 items):
- Film cutter available
- Unwinder roll ready for loading with winding shaft inside
- New core ready (optional)
- Graphite paste bucket available
- Apron ready with required tools
Other (4 items): Tool box ready confirmation, gloves worn, crane in correct position, masking tape pre-cutред
Check list shift in-charge planned chamber opening рд╕реЗ рдПрдХ рдШрдВрдЯрд╛ рдкрд╣рд▓реЗ fill рдХрд░рддрд╛ рдерд╛ред рдЕрдЧрд░ рдПрдХ рднреА item missing рдерд╛, boat change delay рд╣реЛ рдЬрд╛рддрд╛ рдерд╛ред рдпреЗ non-negotiable рдерд╛ред Check list рдиреЗ рдХрд┐рд╕реА рднреА tool change рд╕реЗ рдЬрд╝реНрдпрд╛рджрд╛ time рдмрдЪрд╛рдпрд╛ рдХреНрдпреЛрдВрдХрд┐ рдЗрд╕рдиреЗ discovery delays eliminate рдХрд░ рджреАрдВ тАФ рд╡реЛ moments mid-changeover рдЬрдм рдХрд┐рд╕реА рдХреЛ realise рд╣реЛрддрд╛ рдерд╛ рдХрд┐ рдЙрд╕реЗ рдХреЛрдИ рдЪреАрдЬрд╝ рдЪрд╛рд╣рд┐рдП рдЬреЛ 5 minutes рджреВрд░ рд╣реИред
ЁЯУК Step 1 Progression тАФ 8 Weeks рдХрд╛ Real Data
рд╣рдорд╛рд░реЗ project records рд╕реЗ actual week-by-week boat change time рдпрд╣рд╛рдБ рд╣реИред Variation notice рдХрд░реЗрдВ тАФ рдХреБрдЫ рджрд┐рди рдмреЗрд╣рддрд░ рдереЗ, рдХреБрдЫ рдХрдо, рд▓реЗрдХрд┐рди trend line clear рдереА:
| Date | Time (min) | Notes |
|---|---|---|
| Start (baseline) | 65 | 3-month historical average |
| 20 July 2017 | 60 | Team formation рдХреЗ рдмрд╛рдж initial measurement |
| 21-23 July | 60-60-60 | Tool boxes designed, install рдирд╣реАрдВ рд╣реБрдП |
| 28 July | 55 | Tool boxes chamber рдореЗрдВ installed |
| 29-31 July | 60-55-56 | рдирдпрд╛ system рд╕реАрдЦрддреЗ рд╣реБрдП variation |
| 2-4 August | 61-55-47 | 4 August рд╕реЗ check list rolled out |
| 5 August | 45 | рдкрд╣рд▓рд╛ sub-50 result |
| 8-12 August | 43-47-43 | Mid-40s рдореЗрдВ stable |
| 13-17 August | 43-39-38 | 17 August рдкреЗ рдкрд╣рд▓рд╛ sub-40 result |
| 21 August | 45-39 | Step 1 final week |
| Step 1 final average | 38 min | Baseline рд╕реЗ 27 min reduction (42% saving) |
рдЗрд╕ progression рдореЗрдВ рддреАрди рдЪреАрдЬрд╝реЗрдВ notice рдХрд░рдиреЗ рд▓рд╛рдпрдХ рд╣реИрдВред рдкрд╣рд▓реА, change linear рдирд╣реАрдВ рдерд╛ред рдмреБрд░реЗ рджрд┐рди рднреА рдереЗ тАФ 29 July рдкреЗ 60 minutes 55 рдХреЗ рдмрд╛рджред рд╣рдордиреЗ panic рдирд╣реАрдВ рдХрд┐рдпрд╛ред рдмреБрд░реЗ рджрд┐рди рд╕реАрдЦрдиреЗ рдХрд╛ part рд╣реИрдВред рджреВрд╕рд░реА, рдмрдбрд╝реА drops specific interventions рдХреЗ рдмрд╛рдж рд╣реБрдИрдВ тАФ tool boxes installation, check list rollout, рд╡реЛ meeting рдЬрд╣рд╛рдБ рд╣рдордиреЗ operator role split рдлрд┐рд░ рд╕реЗ рдмрдирд╛рдпрд╛ред рддреАрд╕рд░реА, week 6 рддрдХ рд╣рдо consistently 45 minutes рд╕реЗ рдиреАрдЪреЗ рдереЗред Step 1 рдХрд╛рдо рдХрд░ рд░рд╣рд╛ рдерд╛ред
ЁЯОп Step 2 тАФ 38 рд╕реЗ 35 Minutes
Mid-August рддрдХ, рд╣рдорд╛рд░рд╛ 38-minute average stable рд╣реЛ рдЧрдпрд╛ рдерд╛ред Team leader рдиреЗ 15 August 2017 рдХреЛ Step 2 review meeting рдмреБрд▓рд╛рдпреА рдПрдХ рдирдП target рдХреЗ рд╕рд╛рде: 30 minutesред рд╣рдо ambitious рдереЗред рд╣рдо рд╡рд╣рд╛рдБ рдкреВрд░реА рддрд░рд╣ рдирд╣реАрдВ рдкрд╣реБрдБрдЪреЗред рд▓реЗрдХрд┐рди 35 рддрдХ рдкрд╣реБрдБрдЪ рдЧрдПред
Step 2 Step 1 рд╕реЗ harder рдерд╛ред рдЖрд╕рд╛рди waste тАФ search-and-fetch, chamber close-and-reopen, duplicate cleanings тАФ рдкрд╣рд▓реЗ рд╣реА рдЬрд╛ рдЪреБрдХрд╛ рдерд╛ред рдЬреЛ рдмрдЪрд╛ рд╡реЛ real work рдерд╛, рдФрд░ faster рд╣реЛрдиреЗ рдХрд╛ рдорддрд▓рдм рдерд╛ micro-choreographyред
Step 2 рдореЗрдВ рд╣рдордиреЗ рдЬреЛ рдХрд┐рдпрд╛:
- 3 shafts offline activity рдХреЗ рд▓рд┐рдП arrangedред Unwinder shaft, rewinder shaft, рдФрд░ рдПрдХ spare pre-stagedред Operator 3 рдЕрдм shafts рдвреВрдБрдв рдирд╣реАрдВ рд░рд╣рд╛ рдерд╛ред
- Step 1 changes рдХреЗ рдмрд╛рдж video рдлрд┐рд░ рд╕реЗ recordedред рдореИрдВрдиреЗ 38-minute level рдкрд░ рдПрдХ рдирдпрд╛ boat change film рдХрд┐рдпрд╛ рдФрд░ рд╣рдордиреЗ 6 рдФрд░ "rearrange" candidates рдФрд░ 3 рдФрд░ "simplify" candidates рдкрд╛рдПред
- 2 graphite buckets available рдХрд░ рджрд┐рдПред рдПрдХ source рдХреЗ рд▓рд┐рдП, рдПрдХ drum shield work рдХреЗ рд▓рд┐рдПред рджреЛ operators рдиреЗ same bucket рдХрд╛ wait рдХрд░рдирд╛ рдмрдВрдж рдХрд░ рджрд┐рдпрд╛ред
- Bubble film chamber рдХреЗ рдЕрдВрджрд░ spreadред Half boat-section length рдХреЗ tray рдкрд░ pre-stagedред рдЕрдм no crumpling рдФрд░ re-spreadingред
- Boat section 2 equal parts рдореЗрдВ dividedред Operator 1 рдиреЗ рдПрдХ half рд▓рд┐рдпрд╛, Operator 2 рдиреЗ рджреВрд╕рд░рд╛ред рджреЛрдиреЛрдВ cleaning рдкрд░ parallel рдХрд╛рдо рдХрд░рддреЗ рдереЗ, рдПрдХ рдХреЗ рджреВрд╕рд░реЗ рдХрд╛ wait рдХрд░рдиреЗ рдХреА рдЬрдЧрд╣ред
- Unwinder masking tape рдХреЗ рд╕рд╛рде readyред Pre-applied tape рдиреЗ "got tape" 90-second walk eliminate рдХреАред
- рдирдП tools рдХрд╛ set arrangedред Including рдПрдХ custom clamp face cleaner рдЬреЛ 3 clamps per minute clean рдХрд░рддрд╛ рдерд╛ (versus manual 30 seconds per clamp)ред
4 рд╣рдлреНрддреЛрдВ рдореЗрдВ Step 2 progression:
| Date | Time (min) | Notes |
|---|---|---|
| Step 2 start | 52 | Step 2 changes рд╕реЗ рдкрд╣рд▓реЗ re-baseline |
| 22-26 August | 50-48-45-41 | 3-shaft + 2-bucket + tape pre-stage |
| 28-30 August | 40-37-38 | Sub-40 stable |
| 2-7 September | 45-42-36-36 | Best week тАФ three sub-37 results |
| Step 2 final average | 35 min | Original baseline рд╕реЗ 30 min reduction (46% saving) |
ЁЯУЛ Activity-Level Time Study тАФ Minutes рдХрд╣рд╛рдБ рдЬрд╛рддреЗ рд╣реИрдВ
Readers рдЬреЛ рдХрд╛рдо рдХреЛ second-by-second рджреЗрдЦрдирд╛ рдЪрд╛рд╣рддреЗ рд╣реИрдВ, рдпрд╣рд╛рдБ рд╣реИ exactly рдХрд┐ рдПрдХ operator boat change рдореЗрдВ рдХреНрдпрд╛ рдХрд░рддрд╛ рд╣реИред рдпреЗ рдореЗрд░реА actual 11 September 2017 video documentation рд╕реЗ рд╣реИ, theoretical estimates рдирд╣реАрдВред
Operator 1 (Source Section) тАФ 31 activities, 35:43 total time:
| # | Activity | Time | ECRS Action |
|---|---|---|---|
| 1 | Chamber Opening | 0:50 | Internal тАФ physics |
| 4 | Tool Taking | 0:23 | Tool box system рд╕реЗ Eliminated |
| 5,7 | Shutter Cleaning Outside + Inside | 0:55 + 1:06 | Single pass рдореЗрдВ Combined |
| 10,12,14 | Boat section cleaning by scrapper (3 rounds) | 0:55 + 1:12 + 5:00 | 1 round рдореЗрдВ Combined + simplified scrapper |
| 11 | Boat section + guide pipe cleaning by rod | 3:40 | Internal тАФ must do |
| 13 | Boat removal | 0:16 | Internal тАФ physics |
| 15 | Getting air tube | 0:21 | Eliminated тАФ air tube control valve рдФрд░ location defined |
| 16 | Cleaning by air tube | 2:41 | Internal тАФ must do |
| 18,25 | Graphite paint on boat section (2 passes) | 1:35 + 0:40 | Internal тАФ must do |
| 20 | Boat mounting | 4:54 | Internal тАФ must do (longest single activity) |
| 26 | Wire movement checking | 1:50 | Internal тАФ must do |
| 28-31 | Chamber closing тЖТ opening тЖТ shield setting тЖТ closing again | 2:01 | Eliminated тАФ proper sequencing prevents this |
ECRS рдХреЗ through, Operator 1 рдХрд╛ total 35:43 рд╕реЗ 31:35 рддрдХ dropped тАФ рд▓рдЧрднрдЧ 4 minutes offред 3 operators рдкрд░ overlapping ECRS gains рдХреЗ рд╕рд╛рде multiplied, choreography рдЗрддрдиреА improve рд╣реБрдИ рдХрд┐ overall changeover рд╕реЗ 25+ minutes drop рд╣реЛ рдЧрдПред
Activity table рд╕реЗ рд╕рдмрд╕реЗ powerful insight: boat mounting рдЕрдХреЗрд▓рд╛ рд▓рдЧрднрдЧ 5 minutes рд▓реЗрддрд╛ рд╣реИ рдФрд░ source design рдмрджрд▓реЗ рдмрд┐рдирд╛ рдЗрд╕реЗ compress рдХрд░рдиреЗ рдХрд╛ рддрд░реАрдХрд╝рд╛ рдирд╣реАрдВ рд╣реИред рд╣рдордиреЗ рдЗрд╕реЗ hard floor рдорд╛рди рд▓рд┐рдпрд╛ред рдмрд╛рдХрд╝реА рд╕рдм negotiable рдмрди рдЧрдпрд╛ред
ЁЯТб рдХреНрдпрд╛ рдХрд╛рдо рдХрд┐рдпрд╛, рдХреНрдпрд╛ рдирд╣реАрдВ
рдкреАрдЫреЗ рджреЗрдЦрддреЗ рд╣реБрдП, рдпрд╣рд╛рдБ рд╡реЛ lessons рд╣реИрдВ рдЬреЛ рдХрд┐рд╕реА рднреА plant рдореЗрдВ translate рд╣реЛрддреЗ рд╣реИрдВ:
рдХреНрдпрд╛ рдХрд╛рдо рдХрд┐рдпрд╛ред Actual changeover film рдХрд░рдирд╛ рдФрд░ team рдХреЗ рд╕рд╛рде рджреЗрдЦрдирд╛ред рдХреЛрдИ рдЬреЛ video evidence рджрд┐рдЦреА рдЙрд╕реЗ deny рдирд╣реАрдВ рдХрд░ рд╕рдХрддрд╛ рдерд╛ред "рд╣рдо рдкрд╣рд▓реЗ рд╕реЗ efficient рдХрд░рддреЗ рд╣реИрдВ" defence video evidence рдХреЗ рд╕рд╛рдордиреЗ рдврд╣ рдЧрдпреАред рдХрд╛рдо рдХреЗ рдкрд╛рд╕ tool boxes, tool room рдореЗрдВ рдирд╣реАрдВред Chamber opening рд╕реЗ рдПрдХ рдШрдВрдЯреЗ рдкрд╣рд▓реЗ consumables pre-stagingред Source section рджреЛ halves рдореЗрдВ рдмрд╛рдБрдЯрдирд╛ рддрд╛рдХрд┐ рджреЛ operators parallel рдХрд╛рдо рдХрд░ рд╕рдХреЗрдВред рджрд┐рди рдХрд╛ data рдПрдХ number рд╕реЗ end рдХрд░рдирд╛ тАФ рд╣рд░ shift рдЕрдкрдирд╛ boat change time рд▓рд┐рдЦрддреА рдереА, рдФрд░ number operator pride рдХрд╛ рд╣рд┐рд╕реНрд╕рд╛ рдмрди рдЧрдпрд╛ред
рдХреНрдпрд╛ рдХрд╛рдо рдирд╣реАрдВ рдХрд┐рдпрд╛, рдХрдо рд╕реЗ рдХрдо рдкрд╣рд▓реЗ рддреЛ рдирд╣реАрдВред Operator input рдХреЗ рдмрд┐рдирд╛ top-down instructionsред рдкрд╣рд▓реЗ рд╣рдлреНрддреЗ рд╣рдордиреЗ рдпреЗ try рдХрд┐рдпрд╛ рдФрд░ resistance рдорд┐рд▓рд╛ред Choreography рддрднреА stick рд╣реБрдИ рдЬрдм operators рдиреЗ рдЦреБрдж redesign рдХреА тАФ рд╣рдордиреЗ framework provide рдХрд┐рдпрд╛ (ECRS, video, time data), рдЙрдиреНрд╣реЛрдВрдиреЗ actual sequencing рдХреАред Crane movement problem рдкреВрд░реЗ project рдореЗрдВ persist рдХреА тАФ рд╣рдордиреЗ precise crane positioning рд╕реЗ 2-3 minute delays identify рдХреАрдВ, рд▓реЗрдХрд┐рди electrical fix capex-dependent рдерд╛ рдФрд░ рд╣рдорд╛рд░реА window рдореЗрдВ рдирд╣реАрдВ рд╣реБрдЖред Chamber closing problem (3-4 minute occasional delay) similar рдереА тАФ mechanical fix neededред
рдЕрдЧрд░ рдореИрдВ рдпреЗ project рдЖрдЬ рдлрд┐рд░ рдХрд░ рд░рд╣рд╛ рд╣реЛрддрд╛, рддреЛ Day 1 рд╕реЗ video рд╢реБрд░реВ рдХрд░рддрд╛, Week 2 рддрдХ team buy-in рд▓реЗрддрд╛, Week 3 рддрдХ tool boxes install рдХрд░рддрд╛, рдФрд░ Week 4 рд╕реЗ daily numbers track рдХрд░рдирд╛ рд╢реБрд░реВ рдХрд░рддрд╛ред рдмрд╛рдХрд╝реА рд╕рдм рдЙрди рдЪрд╛рд░ steps рд╕реЗ flow рд╣реЛрддрд╛ рд╣реИред
ЁЯФД рдЕрдкрдиреЗ Plant рдореЗрдВ рдпреЗ рдХреИрд╕реЗ Apply рдХрд░реЗрдВ
рдЕрдЧрд░ рдЖрдк рдпреЗ рдкрдврд╝ рд░рд╣реЗ рд╣реИрдВ рдФрд░ рдЖрдкрдХрд╛ boat change рдЕрднреА рднреА 60+ minutes рд╣реИ, рддреЛ рдЖрдкрдХреЗ рд╕рд╛рдордиреЗ 25-30 minute рдХрд╛ opportunity sitting рд╣реИ plain sight рдореЗрдВред рдпрд╣рд╛рдБ рд╣реИ рдХреИрд╕реЗ рд╢реБрд░реВ рдХрд░реЗрдВ, рдЙрд╕реА week-by-week рддрд░реАрдХрд╝реЗ рд╕реЗ рдЬреИрд╕реЗ рд╣рдордиреЗ рдХрд┐рдпрд╛ред
Week 1 тАФ Film рдФрд░ document рдХрд░реЗрдВред рдПрдХ smartphone borrow рдХрд░реЗрдВ рдпрд╛ рдПрдХ small video camera рд▓реЗрдВред рдПрдХ complete boat change start to finish record рдХрд░реЗрдВред рдЕрдкрдиреА team рдХреЗ рд╕рд╛рде рдмреИрдареЗрдВ рдФрд░ рджреЗрдЦреЗрдВ, stopwatch рд╣рд╛рде рдореЗрдВред рд╣рд░ distinct activity рдХреЛ spreadsheet рдореЗрдВ log рдХрд░реЗрдВ тАФ name, start time, end time, durationред рдЙрд╕ рд╣рдлреНрддреЗ рджреЛ рдФрд░ boat changes рдХреЗ рд▓рд┐рдП рдпреЗ рдХрд░реЗрдВред Week 1 рдХреЗ end рдкрд░ рдЖрдкрдХреЗ рдкрд╛рд╕ 60-80 row activity table рд╣реЛрдЧреА рдЬреЛ рдЖрдкрдХреЗ plant рдореЗрдВ рдХрд┐рд╕реА рдиреЗ рдкрд╣рд▓реЗ рдирд╣реАрдВ рджреЗрдЦреАред
Week 2 тАФ ECRS analysis run рдХрд░реЗрдВред рдЕрдкрдиреА activity table рд▓реЗрдВ рдФрд░ рдЪрд╛рд░ columns add рдХрд░реЗрдВ: Eliminate, Combine, Rearrange, Simplifyред рд╣рд░ row рдкрд░ рдЬрд╛рддреЗ рд╣реБрдП mark рдХрд░реЗрдВ рдХреМрди рд╕рд╛ action apply рд╣реЛрддрд╛ рд╣реИред Team рдХреЛ рд╕рд╛рде рдХрд░рдирд╛ рдЪрд╛рд╣рд┐рдП тАФ operators рдХреЗ рдкрд╛рд╕ insights рд╣реИрдВ рдЬреЛ рдЖрдкрдХреЗ рдкрд╛рд╕ рдирд╣реАрдВ рд╣реИрдВред 8-15 activities рдорд┐рд▓рдиреЗ рдХреА expect рдХрд░реЗрдВ рдЬреЛ entirely eliminate рд╣реЛ рд╕рдХрддреА рд╣реИрдВ, 5-10 рдФрд░ рдЬреЛ combine рд╣реЛ рд╕рдХрддреА рд╣реИрдВ, рдФрд░ 10-15 рдЬреЛ offline rearrange рд╣реЛ рд╕рдХрддреА рд╣реИрдВред рдпреЗ рдЖрдкрдХрд╛ project plan рд╣реИред
Week 3 тАФ Offline prep system install рдХрд░реЗрдВред Highest-ROI рджреЛ changes рд╣реИрдВ tool boxes рдФрд░ 1-Hour Prior Check Listред Tool boxes expensive рд╣реЛрдиреЗ рдЬрд╝рд░реВрд░реА рдирд╣реАрдВ тАФ рдкрд╣рд▓реЗ рдорд╣реАрдиреЗ clearly labeled cardboard boxes рднреА рдХрд╛рдо рдХрд░реЗрдВрдЧреЗред рдЙрдиреНрд╣реЗрдВ рд╡рд╣рд╛рдБ position рдХрд░реЗрдВ рдЬрд╣рд╛рдБ рдХрд╛рдо рд╣реЛрддрд╛ рд╣реИ, рдЕрд▓рдЧ room рдореЗрдВ рдирд╣реАрдВред Check list one A4 page рдкрд░ fit рд╣реЛрдирд╛ рдЪрд╛рд╣рд┐рдП рдФрд░ shift in-charge chamber open рд╣реЛрдиреЗ рд╕реЗ рдПрдХ рдШрдВрдЯреЗ рдкрд╣рд▓реЗ fill рдХрд░реЗред Items ready рдирд╣реАрдВ means changeover рдПрдХ рдШрдВрдЯреЗ delayред рдпреЗ non-negotiable рд╣реИ system рдХрд╛рдо рдХрд░рдиреЗ рдХреЗ рд▓рд┐рдПред
Week 4 тАФ рдирдпреА choreography roll out рдХрд░реЗрдВред рдЕрдкрдиреЗ operators рдХреЛ clear roles рдореЗрдВ split рдХрд░реЗрдВ: Person 1 source рдХрд╛ owner, Person 2 loading/unloading рдХрд╛ owner, Person 3 (typically trainee рдпрд╛ floating helper) offline prep рдФрд░ during-changeover support handle рдХрд░реЗред Choreography рдПрдХ page рдкрд░ document рдХрд░реЗрдВред Machine рдкрд░ post рдХрд░реЗрдВред рд╣рд░ changeover time track рдХрд░реЗрдВред Day one рдкреЗ 35-minute target рдХрд╛ aim рди рдХрд░реЗрдВ тАФ рдкрд╣рд▓реЗ рдорд╣реАрдиреЗ "consistently 50 minutes рд╕реЗ рдиреАрдЪреЗ" рдХрд╛ aim рдХрд░реЗрдВ, рдлрд┐рд░ рд╡рд╣рд╛рдБ рд╕реЗ push рдХрд░реЗрдВред
Months 2-3 тАФ Step 2 refinementред рдПрдХ рдмрд╛рд░ 40s рдореЗрдВ stable рд╣реЛ рдЬрд╛рдПрдБ, рдлрд┐рд░ film рдХрд░реЗрдВред Waste рдХреА рдЕрдЧрд▓реА layer рдвреВрдБрдвреЗрдВред рдмрд╛рдХрд╝реА 5-10 minute opportunity second-level choreography рд╕реЗ рдЖрддрд╛ рд╣реИ тАФ source section рдореЗрдВ division of labour, operators рдХреЗ рдмреАрдЪ parallel work, micro-task orderingред рдпреЗ harder phase рд╣реИ, рд▓реЗрдХрд┐рди ground rules same рд╣реИрдВ: ECRS, video, daily numbersред
ЁЯТ░ Honest Economics тАФ 3 Lenses
рдЬрд╝реНрдпрд╛рджрд╛рддрд░ SMED articles savings рдХреЗ рд▓рд┐рдП single number use рдХрд░рддреЗ рд╣реИрдВред Honest answer depend рдХрд░рддрд╛ рд╣реИ рдЖрдк рдХрд┐рд╕ lens рд╕реЗ рджреЗрдЦ рд░рд╣реЗ рд╣реИрдВред
Lens 1 тАФ Raw production time recoveredред 25-30 minutes saved per cycle, рд╣рд░ machine 1.34 cycles per day = рд╣рд░ machine 35-40 minutes recovered per day = рд╣рд░ machine ~18-20 hours per monthред 2-machine plant рдХреЗ рд▓рд┐рдП, ~36-40 hours monthly capacity recoveredред рдпреЗ mathematically uncontestable рд╣реИред
Lens 2 тАФ Realistic extra jumbos deliveredред Raw time one-to-one extra jumbos рдореЗрдВ рдирд╣реАрдВ рдмрдирддрд╛ред Next-stage limits (slitter, packaging, dispatch) typically raw potential рдХрд╛ 30-40% capture рдХрд░рддреЗ рд╣реИрдВред Realistic delivery: per plant 2-3 extra jumbos per month рд╕рд┐рд░реНрдлрд╝ boat-set changes рд╕реЗред тВ╣15,000-20,000 contribution margin per jumbo рдкрд░, рдпреЗ рд╣реИ тВ╣3-6 lakh additional monthly marginред
Lens 3 тАФ OEE improvementред рд╕рд┐рд░реНрдлрд╝ boat-set changes (рдЗрд╕ blog рдХрд╛ focus) рд╕реЗ setup time 1,440-minute day рдХрд╛ 1-2 percentage points drop рд╣реЛрддрд╛ рд╣реИред рдмрдбрд╝реА OEE win рддрдм рдЖрддреА рд╣реИ рдЬрдм рдпреЗ same techniques inter-cycle changeovers рдкрд░ apply рд╣реЛрдВ, рдЬреЛ additional 14-16 percentage points OEE recovery add рдХрд░рддреЗ рд╣реИрдВред Combined effect (boat-set + inter-cycle SMED) typically +15 рд╕реЗ +18 percentage points OEE Availability рдкрд░ land рд╣реЛрддрд╛ рд╣реИред рдЬрд╝реНрдпрд╛рджрд╛рддрд░ management dashboards рдХреЗ рд▓рд┐рдП, рд╡реЛ number рд╕рдмрд╕реЗ important рд╣реИред
рд╣рдорд╛рд░реЗ 2017 project рдХреЗ рд▓рд┐рдП specifically, рд╣рдордиреЗ 15 min per day per machine рдХреА savings calculate рдХреА, рдЬреЛ рд╣рд░ рдорд╣реАрдиреЗ 4 tonnes additional metallised film рдореЗрдВ translate рд╣реБрдИред рд╡реЛ number conservative рдерд╛ тАФ savings рдХреЛ recovered minutes alone рдХреА рдЬрдЧрд╣ recovered production time рдХреЗ рд░реВрдк рдореЗрдВ measure рдХрд░рдирд╛ clearer picture рджреЗрддрд╛ рд╣реИред
ЁЯФм Common Objections тАФ Honest Answers
"рд╣рдорд╛рд░рд╛ metalliser рдЕрд▓рдЧ рд╣реИ тАФ рдпреЗ times apply рдирд╣реАрдВ рд╣реЛрддреАрдВред" Physics floor (vent, pump, source verify, film handling рдХреЗ рд▓рд┐рдП minimum 15-16 minutes) universal рд╣реИред рдЖрдкрдХрд╛ starting baseline 50 min рд╣реЛ рд╕рдХрддрд╛ рд╣реИ рдпрд╛ 80 min тАФ ECRS-based work рд╕реЗ percentage saving same рд╣реИред рд╣рдордиреЗ 42-46% reduction рджреЗрдЦреАред рдЖрдк likely 30-50% рджреЗрдЦреЗрдВрдЧреЗред
"рд╣рдорд╛рд░реЗ рдкрд╛рд╕ changeover рдХреЗ рд▓рд┐рдП dedicated рддреАрд╕рд░рд╛ operator рдирд╣реАрдВ рд╣реИред" рддрдм рдЖрдкрдХрд╛ realistic target 45 minutes рд╣реИ, 35 рдирд╣реАрдВред 3-person choreography 40 minutes рддреЛрдбрд╝рдиреЗ рдХреЗ рд▓рд┐рдП optional рдирд╣реАрдВ рд╣реИред рдЕрдЧрд░ headcount constraint рд╣реИ, math рдХрд░реЗрдВ рдХрд┐ рдХреНрдпрд╛ рдПрдХ extra dedicated changeover person (тВ╣3-5 lakh annual salary) per month 2-3 extra jumbos worth тВ╣3-6 lakh рдХреЗ through рдЦреБрдж рдХреЛ pay рдХрд░рддрд╛ рд╣реИред Answer almost always yes рд╣реИред
"Operators written choreography follow рдирд╣реАрдВ рдХрд░реЗрдВрдЧреЗред" рдХрд░реЗрдВрдЧреЗ, рдЬрдм рд╡реЛ рджреЗрдЦреЗрдВрдЧреЗ changeover рдЫреЛрдЯрд╛ рдФрд░ рдХрдо stressful рд╣реИред рдЬрд╝реНрдпрд╛рджрд╛рддрд░ operators long changeovers рд╕реЗ рдирдлрд╝рд░рдд рдХрд░рддреЗ рд╣реИрдВ тАФ long means rushed, rushed means mistakesред рдПрдХ choreographed 35-minute changeover clear roles рдХреЗ рд╕рд╛рде рдПрдХ improvised 65-minute рд╕реЗ calmer рд╣реИ рдЬрд╣рд╛рдБ рддреАрди рд▓реЛрдЧ рдПрдХ-рджреВрд╕рд░реЗ рд╕реЗ рдЯрдХрд░рд╛ рд░рд╣реЗ рд╣реИрдВред Critically, operators рдХреЛ choreography рдЦреБрдж redesign рдХрд░рдиреА рдЪрд╛рд╣рд┐рдП тАФ top-down imposition fail рд╣реЛрддрд╛ рд╣реИред Supervisor рдХрд╛ job рд╣реИ choreography define рд╣реЛрдиреЗ рдХреЗ рдмрд╛рдж enforce рдХрд░рдирд╛, invent рдХрд░рдирд╛ рдирд╣реАрдВред
"рд╣рдордиреЗ рдкрд╣рд▓реЗ SMED try рдХрд┐рдпрд╛ рдерд╛ рдФрд░ stick рдирд╣реАрдВ рд╣реБрдЖред" SMED рддрдм fail рд╣реЛрддрд╛ рд╣реИ рдЬрдм daily measurement step рдХреЗ рдмрд┐рдирд╛ implement рд╣реЛрддрд╛ рд╣реИред рд╣рдордиреЗ рд╣рд░ shift рдкрд░ boat change time board рдкрд░ post рдХрд┐рдпрд╛ред Number operator pride рдмрди рдЧрдпрд╛ред рдЙрд╕ visible accountability рдХреЗ рдмрд┐рдирд╛, рдХреЛрдИ рднреА SMED gain рдорд╣реАрдиреЛрдВ рдореЗрдВ regress рд╣реЛ рдЬрд╛рддрд╛ рд╣реИред
"рдЕрдЧрд░ рд╣рдорд╛рд░реЗ рдкрд╛рд╕ crane / chamber / electrical issues рд╣реЛрдВ рдЬреИрд╕реЗ рдЖрдкрдХреЗ рдереЗ?" рдЙрдиреНрд╣реЗрдВ document рдХрд░реЗрдВ, maintenance рдХреЛ escalate рдХрд░реЗрдВ, рдФрд░ SMED work continue рдХрд░реЗрдВред Capex-dependent issues рдЖрдкрдХреЗ project рдХреА responsibility рдирд╣реАрдВ рд╣реИрдВ solve рдХрд░рдиреЗ рдХреА тАФ рд╡реЛ parallel track рдкрд░ рд░рдЦреЗрдВред рд╣рдорд╛рд░реЗ crane рдФрд░ chamber issues рд╣рдорд╛рд░реЗ рдкреВрд░реЗ project рдореЗрдВ persist рдХрд┐рдПред рд╣рдо рдлрд┐рд░ рднреА 35 minutes hit рдХрд┐рдПред Capex fix рд╣рдореЗрдВ 30 рддрдХ рдкрд╣реБрдБрдЪрд╛ рджреЗрддрд╛ред
рдЕрдЧрд░ рдЖрдкрдХреА team рдХреЗ рдкрд╛рд╕ рдКрдкрд░ answered рдирд╣реАрдВ рд╣реБрдП рд╕рд╡рд╛рд▓ рд╣реИрдВ, рдЙрди рд╕рдмрдХреЗ рдЬрд╡рд╛рдм рд▓рдЧрднрдЧ рд╣рдореЗрд╢рд╛ рдЖрдкрдХреЗ рдЕрдкрдиреЗ video footage рдФрд░ time-stamped activity log рдореЗрдВ рд╣реИрдВред рдпрд╣реА reason рд╣реИ рдХрд┐ filming рдФрд░ documenting рдХрд┐рд╕реА рднреА SMED project рдХреА foundation рд╣реИред
ЁЯУе VKS Tech SMED Action Card Download рдХрд░реЗрдВ (PDF)
2017 MET-1 project рд╕реЗ рдмрдирд╛ рдПрдХ 6-page printable kit тАФ рдЗрд╕ рдорд╣реАрдиреЗ рдЕрдкрдиреА SMED journey рд╢реБрд░реВ рдХрд░рдиреЗ рдХреЗ рд▓рд┐рдП рд╕рдм рдХреБрдЫ:
- Pages 1-3 (Reference): ECRS method, 3 tool box specs, 8-week progression data, activity-level time study, 4-week implementation guide
- Page 4 (Blank Format 1): 1-Hour Prior Check List 21 empty tick boxes рдХреЗ рд╕рд╛рде тАФ рд╣рд░ shift рдПрдХ print рдХрд░реЗрдВ, chamber open рд╣реЛрдиреЗ рд╕реЗ рдкрд╣рд▓реЗ fill рдХрд░реЗрдВ
- Page 5 (Blank Format 2): Daily Boat Change Time Log тАФ рдорд╣реАрдиреЗ рдХреЗ рд▓рд┐рдП 22 blank rows, monthly summary section рдХреЗ рд╕рд╛рдеред рджреАрд╡рд╛рд░ рдкрд░ post рдХрд░реЗрдВред
- Page 6 (Blank Format 3): ECRS Analysis Worksheet тАФ рдПрдХ changeover film рдХрд░реЗрдВ, рд╣рд░ activity list рдХрд░реЗрдВ, E/C/R/S mark рдХрд░реЗрдВ, 20-40 changes identify рдХрд░реЗрдВ
Pages 4-6 print рдХрд░реЗрдВ, рдЬрд╝рд░реВрд░рдд рдХреЗ рдЕрдиреБрд╕рд╛рд░ photocopy рдХрд░реЗрдВ, рдЕрдкрдиреЗ shift in-charge рдХреЛ рджреЗрдВред Action Card рдЖрдкрдХреА 8-week SMED kit рд╣реИред